EIA Notice: Xinyonglong's 50,000-Unit Annual Special Parts Project

2026-05-06Views: 5

1. Project Name: Guangzhou Xinyonglong Special Equipment Parts Co., Ltd. Annual Production of 50,000 Special Equipment Parts


2. Project Description:

   Location: Workshop 102, No. 4 Factory Building, Qingluo Road Side, Dong Village, Shawan Town, Panyu District, Guangzhou

   Nature of Construction: New Project

   Overview: This project is located at Workshop 102, No. 4 Factory Building, Qingluo Road Side, Dong Village, Shawan Town, Panyu District, Guangzhou. The project leases a factory building from Guangzhou Panyu Shawan Jianye Hardware Factory, covering an area of approximately 1,000 m², with land use type classified as industrial land. The project is primarily engaged in the production of special equipment parts, with an annual output of 50,000 units. The total investment is approximately RMB 2 million, of which environmental protection investment is RMB 100,000, accounting for 5% of the total investment. The project does not have central air conditioning or cooling towers. The project employs 20 workers and operates 300 days per year.


3. Developer:

   Developer: Guangzhou Xinyonglong Special Equipment Parts Co., Ltd.

   Address: Workshop 102, No. 4 Factory Building, Qingluo Road Side, Dong Village, Shawan Town, Panyu District, Guangzhou

   Contact: Huang Xiaowu

   Tel: 18928766247


4. EIA Consultant:

   Consultant: Guangzhou Environmental Protection Engineering Design Institute Co., Ltd. (National EIA Certificate No. B-2834)

   Address: No. 20 Zengsha Street, Huilong Road, Guangzhou

   Contact: Engineer Huang

   Tel: 020-83363613


5. EIA Work Procedures and Main Content:

   The EIA work is generally divided into three stages. The first stage is the preparation stage, which involves studying relevant documents, conducting preliminary project engineering analysis and environmental baseline surveys, screening key assessment items, determining the assessment level for each environmental aspect, and preparing the assessment work plan. The second stage is the formal working stage, which involves further engineering analysis, environmental baseline surveys, and environmental impact prediction and assessment. The third stage is the report preparation stage, which involves compiling and analyzing all data and information obtained from the second stage, drawing conclusions, and completing the EIA report.


6. Scope of Public Consultation and Main Topics:

   The scope and subjects of public participation are the surrounding public affected by the project, including citizens, legal persons, or other organizations. The public participation methods include publishing environmental information on the website and posting public notices at sensitive locations, as well as conducting written questionnaire surveys to solicit public opinions. The main topics for public consultation are the public's views and suggestions on the expected impacts of the project on the natural and social environment of the project area.


7. Forms of Public Consultation:

   Environmental information will be published on the website, supplemented by questionnaire surveys; opinions will be collected via online platforms, telephone, and email.


8. Submission Methods and Timeframe for Public Comments:

   The public may submit their comments and suggestions on the project by filling out survey forms, making phone calls, sending faxes, or emailing. The public comment period is 10 working days from the date of this public notice.

   Note: Please provide detailed contact information when submitting comments so that we can provide timely feedback.


Guangzhou Xinyonglong Special Equipment Parts Co., Ltd.

August 6, 2018