EIA First Notice: Guangdong Richang — 350,000 Furniture Units/Year

2026-05-06Views: 5

1. Project Name: Guangdong Richang Industrial Co., Ltd. Annual Production of 350,000 Pieces of Furniture


2. Project Overview: Guangdong Richang Industrial Co., Ltd. is located at No. 1 Wende Third Street, Zhaoqing High-tech Zone. The total investment is RMB 50 million (environmental protection investment: RMB 5 million). The site covers an area of 36,273.23 m² with a total floor area of approximately 58,230 m². Due to market changes, the original market positioning of low-end hotel furniture (without painting) deviated significantly from the company's development strategy. Therefore, the company plans to shift to high-end furniture production, add painting processes, and construct one additional 1-story factory building, one 1-story paint warehouse, and one 1-story hazardous waste warehouse. After the adjustment, the annual production capacity is 175,000 pieces of wooden furniture, 87,500 pieces of metal furniture, and 87,500 pieces of soft furniture, totaling 350,000 pieces per year.


3. Developer: Guangdong Richang Industrial Co., Ltd.

   Address: No. 1 Wende Third Street, Zhaoqing High-tech Zone

   Contact: Engineer Luo

   Tel: 0757-86688988


4. EIA Consultant: Guangzhou Environmental Protection Engineering Design Institute Co., Ltd. (National EIA Certificate No. B-2834)

   Contact: Engineer Lin

   Tel: 020-83363613

   Email: 2473727982@qq.com


5. EIA Work Procedures and Main Content: The EIA work is generally divided into three stages. The first stage is the preparation stage, which involves studying relevant documents, conducting preliminary project engineering analysis and environmental baseline surveys, screening key assessment items, determining the assessment level for each environmental aspect, and preparing the assessment work plan. The second stage is the formal working stage, which involves further engineering analysis, environmental baseline surveys, and environmental impact prediction and assessment. The third stage is the report preparation stage, which involves compiling and analyzing all data and information obtained from the second stage, drawing conclusions, and completing the EIA report.


6. Scope of Public Consultation and Main Topics: The scope and subjects of public participation are the surrounding public affected by the project, including citizens, legal persons, or other organizations. The public participation methods include publishing environmental information on the website and posting public notices at sensitive locations, as well as conducting written questionnaire surveys to solicit public opinions. The main topics for public consultation are the public's views and suggestions on the expected impacts of the project on the natural and social environment of the project area.


7. Forms of Public Consultation: Environmental information will be published on the website, supplemented by questionnaire surveys; opinions will be collected via online platforms, telephone, and email.


8. Submission Methods and Timeframe for Public Comments: The public may submit their comments and suggestions on the project by filling out survey forms, making phone calls, sending faxes, or emailing. The public comment period is 10 days from the date of this public notice.


Note: Please provide detailed contact information when submitting comments so that we can provide timely feedback.


Guangdong Richang Industrial Co., Ltd.

June 19, 2018